Last Date: 11 Oct,2019
ADVT No. DMRC/PERS/22/HR/2019(20)
DELHI METRO RAIL CORPORATION LTD (DMRC)
New Delh
DMRC aka Delhi Metro Rail Corporation invites applications for the post of 04 Dy. Chief Engineer (Civil) . DMRC Recruitment Qualification/ eligibility conditions, how to apply & other rules are given below… Official website http://www.delhimetrorail.com
Employment Notification 04 Dy. Chief Engineer (Civil) Vacancy – DMRC,New Delh
JOB DETAILS:
Name of the post – Dy. Chief Engineer (Civil)
No of post – 04
Pay Scale – Rs. 70,000 – 2,00,000
Education Qualification:
The candidate should be having B.Tech / BE (Civil) .
Apply to 04 Dy. Chief Engineer (Civil) Vacancy – DMRC,New Delh
General Instruction:
- The Delhi Metro Rail Corporation (DMRC) Ltd, a Joint Venture company with equity participation from Govt. of India and Govt. of National Capital Territory of Delhi has been entrusted with the responsibility of implementation of the rail-based Mass Rapid Transit System for Delhi. The Delhi Metro Rail Corporation, Lifeline of Delhi, prides itself on its ability to nurture its employees through its unique work culture. Today, DMRC empowered by about 14,500 employees with MRTS activities spread over Delhi NCR, Jaipur, Kochi, Mumbai etc., carry about 3 million passengers per day in Delhi & NCR. In addition to the above, DMRC is involved in providing consultancy services to number of cities within India and abroad.
- The incumbent of the post shall be responsible for all Civil Deptt. related functions and matters pertaining to Delhi Metro project at Mumbai.
- The selected candidates on deputation will continue to draw parent department pay plus deputation allowance, as applicable under Govt. of India rules.
- Last date of receipt of duly filled in application (along with relevant documents), necessarily forwarded by the current organization OR along with No Objection certificate, through Speed post is 11/10/2019. Incomplete applications or applications not duly forwarded by current organization / without NOC or applications received after the due date, will be summarily rejected. DMRC shall not be responsible for loss / delay in post.
- The list of shortlisted candidates shall be uploaded on DMRC website on 25/10/2019 (tentatively) and interview will be held in the second week of November, 2019 at Metro Bhawan, Barakhamba Road, New Delhi (tentatively) (Complete details will be displayed on DMRC website).
- No separate communication, by post, will be sent to candidates individually. Candidates are required to go through the instructions / schedule for interview displayed on DMRC website and appear for the interview, accordingly along with original copies of testimonials.
- The applicants for approval for deputation, shall be declared by third week of November,2019 (Tentatively).
- Eligible and willing candidates for the aforesaid post may apply as per the application format at Annexure-I. The candidate must enclose all relevant proof / documents in support of qualification,
experience, pay and pay scale. - The candidates presently employed in Central Govt. or Central Public-Sector Undertaking (CPSUs) should send their application through proper channel along with the copies of APARs for the last five years, Vigilance and D&AR clearance, so as to reach the under mentioned address by the stipulated date. The applications received after due date will be summarily rejected.
- The duly filled in application form should be sent in an envelope super scribing on the cover prominently – Name of Post, latest by 11/10/2019, by Speed Post at the following address:
Chief General Manager (HR)
Delhi Metro Rail Corporation Ltd
Metro Bhawan, Fire Brigade Lane,
Barakhamba Road, New Delhi.
About Us:
Vacancy Notice 04 Dy. Chief Engineer (Civil) Vacancy – DMRC,New Delh
- The Delhi Metro has been instrumental in ushering in a new era in the sphere of mass urban transportation in India. The swanky and modern Metro system introduced comfortable, air conditioned and eco-friendly services for the first time in India and completely revolutionized the mass transportation scenario not only in the National Capital Region but the entire country.
- Having constructed a massive network of about 373 Km with 271 stations in record time in Delhi, NCR, the DMRC today stands out as a shining example of how a mammoth technically complex infrastructure project can be completed before time and within budgeted cost by a Government agency.
- The Delhi Metro Rail Corporation Limited (DMRC) was registered on 3rd May 1995 under the Companies Act, 1956 with equal equity participation of the Government of the National Capital Territory of Delhi (GNCTD) and the Central Government to implement the dream of construction and operation of a world- class Mass Rapid Transport System (MRTS).
- The DMRC opened its first corridor between Shahdara and Tis Hazari on 25th December, 2002. Subsequently, the first phase of construction worth 65 kilometres of Metro lines was finished two years and nine months ahead of schedule in 2005. Since then the DMRC has also completed the construction of another 125 kilometres of Metro corridors under the second phase in only four and a half years.
- Presently, the Delhi Metro network consists of about 373 Km with 271 stations. The network has now crossed the boundaries of Delhi to reach NOIDA and Ghaziabad in Uttar Pradesh, Gurgaon, Faridabad, Bahadurgarh and Ballabhgarh in Haryana. With the opening of the Majlis Park to Shiv Vihar and Janakpuri West – Botanical Garden Sections, new age trains equipped with the Unattended Train Operation (UTO) technology have been introduced. These trains operate with the Communication Based Train Control(CBTC) signaling technology which facilitate movement of trains in very short frequencies. This network also includes the NOIDA – Greater NOIDA Aqua Line. The Aqua Line has been constructed by DMRC on behalf of the NOIDA Metro Rail Corporation and is also being operated by DMRC currently. In addition, the 11.7 kilometre long Rapid Metro also connects with the Delhi Metro network at Sikanderpur station of Yellow Line. The Rapid Metro provides connectivity within the satellite city of Gurugram.
- The Airport Express link between the Indira Gandhi International Airport and New Delhi has now propelled Delhi to the league of global cities which have high speed rail connectivity between the city and the airport. The DMRC today has over 300 train sets of four, six and eight coaches.
- The Delhi Metro has also contributed tremendously on the environment front by becoming the first ever railway project in the world to claim carbon credits for regenerative braking. DMRC has also been certified by the United Nations (UN) as the first Metro Rail and Rail based system in the world to get carbon Credits for reducing Green House gas emissions as it has helped to reduce pollution levels in the city by 6.3 lakh tons every year thus helping in reducing global warming.
- It has also set up roof top solar power plants at many of its stations. All stations of the presently under construction corridors are being constructed as green buildings. In the present phase of Delhi Metro’s construction, the DMRC is nearing the completion of 160 kilometres of Metro lines which has woven a web of Metro corridors along the city’s Ring Road besides connecting with many other localities in NOIDA, Ghaziabad, Bahadurgarh and Ballabhgarh.
- Apart from providing Delhites with a comfortable public transport option, the Delhi Metro is also contributing significantly towards controlling pollution as well as reducing vehicular congestion on the roads.
VACANCY NOTIFICATIONS
click above to download
the employment notification